Abstract:In view of the difficulty of placing and positioning steel pipe structure column in the base pit, the general positioning technology of "three-line one corner" is adopted to ensure the accuracy of the position angle and design of the steel column, and ensure the precise installation of the steel column supporting the steel beam between the subsequent steel pipe columns.