首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到2条相似文献,搜索用时 0 毫秒
1.
This paper presents a method to find the optimal production, repair/replacement and preventive maintenance policies for a degraded manufacturing system. The system is subject to random machine failures and repairs. The status of the system is deemed to degrade with repair activities. When a failure occurs, the machine is either repaired or replaced, and a replacement action renews the machine, while a repair action brings it to a degraded operational state, with the next repair time increasing as the number of repairs increases as well. A preventive maintenance action is considered in order to improve the reliability of the machine, thereby reducing the amount of disruptions caused by machine failures. The decision variables are the production rate, the preventive maintenance rate and the repair/replacement switching policy upon machine failure. The objective of the study is to find the decision variables that minimize the overall cost, including repair, replacement, preventive maintenance, inventory holding and backlog costs over an infinite planning horizon. The proposed model is based on a semi-Markov decision process, and the stochastic dynamic programming method is used to obtain the optimality conditions. A numerical example is given to illustrate the proposed model, and a sensitivity analysis is considered in order to confirm the structure of the control policy and to illustrate the usefulness of the proposed approach.  相似文献   

2.
针对目前工程项目风险评价与控制模型的不足,将反演思想引进风险管理过程中,建立了基于模糊逻辑方法的工程项目投资风险评价与控制的反演模型。该模型在评价方面克服了传统方法中主观色彩浓重的缺点,也避免了智能算法在应用上的限制。在控制方面可以准确地找到工程失败的原因,进而指导其他项目的可行性研究和风险控制。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号