首页 | 本学科首页   官方微博 | 高级检索  
     

清远抽水蓄能电站自流排水洞施工支洞比选
引用本文:徐森泉. 清远抽水蓄能电站自流排水洞施工支洞比选[J]. 价值工程, 2011, 30(9): 52-52
作者姓名:徐森泉
作者单位:清远抽水蓄能电站建设管理局,清远,511853
摘    要:长隧洞的施工工期长,施工支洞的选择显得非常重要;通过支洞方案优化选择、洞口位置优化选择,清远抽水蓄能电站自流排水洞施工支洞的施工达到预期的目的。

关 键 词:抽水蓄能电站  自流排水洞  支洞  优化

Construction Working Tunnel Selection for Gravity Drainage Tunnel in the Qingyuan Pumped Sotrage Power Station
Xu Senquan. Construction Working Tunnel Selection for Gravity Drainage Tunnel in the Qingyuan Pumped Sotrage Power Station[J]. Value Engineering, 2011, 30(9): 52-52
Authors:Xu Senquan
Affiliation:Xu Senquan(Qingyuan Pumped Sotrage Power Station,Qingyuan 511853,China)
Abstract:The long tunnel has a long construction peirod,so it is important to choose a optional working tunnel.The working tunnel of gravity drainage tunnel in Qingyuan Pumped Storage Power Station can reach the desired goal through the optional selection of working tunnel and the optimal selection of entrance position.
Keywords:pumped storage power station  gravity drainage tunnel  working tunnel  optimal selection  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号