首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A production rate control policy for stochastic repair and remanufacturing systems
Authors:Robert Pellerin  Javad Sadr  Ali Gharbi  Roland Malham
Institution:aÉcole Polytechnique de Montréal and CIRRELT Canada;bÉcole de technologie supérieure, Canada;cÉcole Polytechnique de Montréal and GERAD, Canada
Abstract:We consider the control of a manufacturing system responding to planned demand at the end of the expected life of each individual piece of equipment and unplanned demand triggered by a major equipment failure. The difficulty of controlling this type of production system resides in the variable nature of the remanufacturing process. In practice, remanufacturing operations for planned demand can be executed at different rates, referring to different component replacement and repair strategies. We formulate this problem as a multi-level control problem and propose a suboptimal control policy. The proposed control policy is described by inventory thresholds triggering the use of different execution modes. Determination of the control policy parameters is based on parameter optimization of analytical cost expressions. A numerical example based on a real case is presented. Our analysis demonstrates that the use of the proposed control approach can lead to a significant reduction in the total average cost, as compared to current practices.
Keywords:Repair  Remanufacturing  Overhaul  Control policy  Hedging points
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号