首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Scheduling Shipbuilding Using a Constraint Directed Graph Search: DAS-ERECT
Authors:Jae Kyu Lee  Hyung Rim Choi  Ok Ryul Yang  Ho Dong Kim
Abstract:To build a scheduling system for shipbuilding, we have adopted a hierarchical architecture and developed a constraint directed graph search technique for erection scheduling at the dock. First, in the hierarchical architecture, detailed schedules for the lower-level assembly plants are delegated to the individual plant's schedulers as long as the requirements from the higher-level scheduler are satisfied. However, if lower-level scheduling is impossible, the higher-level scheduler attempts to adjust the original requirements. Second, in the constraint directed graph search, the concepts of graph expansion and constraint directed pruning are amalgamated into an algorithm. The approaches are implemented in the DAS-ERECT system which is a sub-system of the DAS project undertaken for the Daewoo Shipbuilding Company.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号