首页 | 本学科首页   官方微博 | 高级检索  
     


Integrated scheduling of a multi-product multi-factory manufacturing system with maritime transport limits
Affiliation:1. University of Nottingham, School of Computer Science, Jubilee Campus, Wollaton Road, Nottingham, NG8 1BB, UK;2. University of Essex, Institute for Analytics and Data Science, Wivenhoe Park, Colchester, CO4 3SQ, UK;3. Cardiff University, School of Mathematics, Senghennydd Road, Cardiff, CF24 4AG, UK
Abstract:This paper studies a practical multi-factory job allocation and scheduling problem involving inland and maritime transport limits. A new heuristic called Due-date Based Cut-off rule (DBC) is developed to improve the computational efficiency of both exact and genetic algorithms (GA). Except the application of DBC, this proposed GA is guided by a novel fuzzy controller aimed at eliminating the drawbacks other GAs have when dealing with multi-factory models. The tests of the solution quality and computational efficiency for this GA are carried out. The numerical experiments demonstrate the value of the proposed approach in this practical global supply chain.
Keywords:Multi-factory manufacturing system  Due date  Maritime transport  Mixed-integer programming  Genetic algorithm  Fuzzy logic
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号