含有3台主变的110kV变电所备自投运行方式分析 |
| |
引用本文: | 李永旭.含有3台主变的110kV变电所备自投运行方式分析[J].企业科技与发展,2009(11):142-144. |
| |
作者姓名: | 李永旭 |
| |
作者单位: | 广西电网公司百色供电局,广西百色533000 |
| |
摘 要: | 随着电网负荷的飞速增长,电网中含有3台主变的110kV变电所将逐渐增多,而电网开环运行的要求与提高用户供电可靠性之间的矛盾,需要通过配置备自投装置来解决。文章从运行角度分析含有3台主变的110kV变电所在备自投装置配置上的要求以及备自投的运行方式。
|
关 键 词: | 变电所 备自投 可靠性 运行方式 |
Operation Ways Analysis of a Substation that Has 3 Major 110 kV Generator Transformers |
| |
Authors: | LI Yong-xu |
| |
Institution: | LI Yong-xu (Baise Power Supply Bureau of Guangxi Grid, Baise Guangxi 533000) |
| |
Abstract: | With rapid development of load in the grid, substations that has 3 general 110 kV transformers has become common while the imbalance between operational requirements of the grid and power supply reliability has to be resolved by self-projection devices. The article, from an operational point of view, analyzes respective operation ways analysis of a substation that has 3 major 110 kV generator transformers and their respective self-projection ways. |
| |
Keywords: | substation self-projection reliability operation ways |