EPC总承包在水汶水电站中的应用 |
| |
引用本文: | 陈关荣,黄锡秋.EPC总承包在水汶水电站中的应用[J].企业科技与发展,2009(14). |
| |
作者姓名: | 陈关荣 黄锡秋 |
| |
作者单位: | 玉林市水利电力建筑工程处,广西,玉林,537001 |
| |
摘 要: | 水汶水电站扩建工程采取EPC总承包方式,总承包单位中标后,通过建立完善的分包组织体系和管理体系,落实管理职责,对分包单位实施一体化管理,确保总承包项目按合同约定顺利交付使用.
|
关 键 词: | 项目管理 总承包制 分包管理 |
The Applications of EPC Contract in Shuiwen Electric Power Station |
| |
Authors: | CHEN Guan-rong HUANG Xi-qiu |
| |
Abstract: | EPC (Engineering, Procurement and Construction) contract is adopted by Shuiwen Electric Power Station. After EPC contractor (EPCC) won the bid, the EPC contract can be completed as the contracted schedule, by improving the man-agement organization system for subcontractors and the management system, implementing management responsibilities and managing the subcontractors in integrative way. |
| |
Keywords: | program management main contract system management on subcontractors |