南水北调中线工程跨区域转让水价成本核算体系研究
引用本文:卢丽荣,刘卫东,姚丽华,张小虎.南水北调中线工程跨区域转让水价成本核算体系研究[J].水利经济,2023,41(4):45-52.
作者姓名:卢丽荣  刘卫东  姚丽华  张小虎
作者单位:河北省水利水电勘测设计研究院集团有限公司,天津300221
基金项目:河北省水利厅科学技术研究项目(冀水科项2020-061)
摘    要:在确定水库与南水北调中线工程总干渠联通技术方案的基础上,将已建水库原水综合成本、联通工程供水综合成本、总干渠输水成本作为应急调蓄供水成本,构建了南水北调中线工程水库应急供水跨区域转让供水成本模型;提出了多水源多目标成本水价核算体系,在多水库联合供水时,将供水成本进行加权综合计算。实例计算结果表明,在不考虑折旧的情况下,南水北调中线工程各水库原水综合成本为0.02~0.44元/m3,联通工程供水综合成本为0.04~2.17元/m3,多水源联合调度不同用水户供水综合成本为0.60~1.71元/m3

关 键 词:应急调蓄  区域转让  水价成本  南水北调中线工程
收稿时间:2022/12/21 0:00:00

Study on cost accounting system of trans regional water transfer
LU Lirong,LIU Weidong,YAO Lihu,ZHANG Xiaohu.Study on cost accounting system of trans regional water transfer[J].Journal of Economics of Water Resources,2023,41(4):45-52.
Authors:LU Lirong  LIU Weidong  YAO Lihu  ZHANG Xiaohu
Institution:Hebei Institute of Investigation and Design of Water Conservancy and Hydropower Co., Ltd., Tianjing 300221, China
Abstract:After the middle route of the South-to-North Water Transfer Project was officially put into operation, it effectively alleviated the shortage of water resources in Beijing-Tianjin-North China. It has become an indispensable main water source in the receiving area. The South-to-North Water Transfer Project is a single-line water transmission, and many uncertain factors may cause water transmission interruption. In order to improve the water supply guarantee of the South-to-North Water Transfer Middle Line Phase I Project, it is very necessary to carry out the emergency water supply research of the built reservoirs along the main canal connection. If the emergency water supply of the reservoir is transferred across regions, the water supply cost needs to be calculated. On the basis of determining the technical scheme of the connection between the reservoir and the main channel, this paper establishes a cross-regional transfer water supply cost model for the emergency water supply of the reservoir, and proposes a multi-source and multi-objective cost water price accounting system. The cost of emergency storage and water supply of the built reservoir includes the comprehensive cost of the raw water of the built reservoir, the cost of the interconnection project, and the cost of water transmission in the main channel section. Among them, the comprehensive cost of raw water for reservoir water supply is divided into two parts: the cost of raw water production of the built reservoir and the compensation for agricultural water consumption; The cost of the Unicom project can be accounted for separately according to three different schemes: no depreciation, depreciation by year and depreciation by time; The water delivery cost of the main channel section is calculated by the water price measured at the water supply target gate and the water price measured at the main channel gate of the reservoir. When multiple reservoirs supply water jointly, the water supply cost is calculated comprehensively and weighted. Research has shown that, without considering depreciation, the raw water cost of each reservoir ranges from 0.02 to 0.44 Yuan/m3, the cost of interconnecting projects ranges from 0.04 to 2.17 Yuan/m3, and the comprehensive water supply cost of multi water source joint scheduling for different water users ranges from 0.60 to 1.71 Yuan/m3. This article analyzes the cost water prices of different schemes based on typical examples, providing a reference basis for calculating the cost water prices of multi source and multi-objective emergency water supply.
Keywords:South-to-North water transfer  built reservoir  emergency storage  regional transfer  cost accounting