首页 | 本学科首页   官方微博 | 高级检索  
     


THE EFFECTS OF FIRM BOUNDARY AND FINANCING CONSTRAINTS ON UTILITY COSTS: THE CASE OF MUNICIPALLY OWNED ELECTRICITY DISTRIBUTION UTILITIES
Authors:Francis J. Cronin  Stephen A. Motluk
Abstract:ABSTRACT: A number of studies have examined costs and potential for scale and scope economies in electricity distribution; however, few if any, have examined this area in terms of the unique constraints associated with municipal ownership or historical and regulatory constraints associated with former municipal ownership. This paper focuses on 19 distribution‐only municipally owned utilities for a ten‐year period (1988–97). Distortions from variable outputs but largely fixed inputs are minimized. The data used were collected specifically to assess productivity, cost, and efficiency performance and include value‐based capital inputs and service prices. Outputs include energy conveyed and number of connections; inputs include capital, system losses, labour, and materials. We examine the effect of using third‐party financing (e.g., connection charges), with its inherent principal‐agent problems, on utility costs, as well as the effect of shared services and multi‐utility output (e.g., electricity and water). A translog total cost function is estimated. Our findings suggest significant returns to scope but also significant increases in costs associated with the use of third‐party financing. The results also suggest scale diseconomies. Shared outputs, which have been greatly restricted or eliminated under restructuring, may have provided larger, and now lost, economies than the scale returns blindly pursued by some through restructuring or incented/forced mergers or divestitures. Finally, it is clear that third‐party financing can raise costs; such financing is widely used among utilities providing electricity, gas, water, and telecommunications, and should be closely scrutinized.
Keywords:electric distribution utilities  utility regulation  restructurings  mergers  financing  connection charges  municipal utilities  boundary choices  D24  G32  G34  G38  L51  L94
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号