铁路工程竣工测量监理要求与方法
引用本文:贾军.铁路工程竣工测量监理要求与方法[J].价值工程,2011,30(5):51-51.
作者姓名:贾军
作者单位:水利部河北水利水电勘测设计研究院,天津,300250
摘    要:在津秦高速铁路建设中,工程涉及隧道、桥涵、路基、轨道、房建等,主体工程完成后,测量监理就要督促施工单位做好竣工测量,对不同工程的竣工测量提出不同的监理要求,为工程竣工验收提供宝贵的竣工测量资料,现将津秦客专监理竣工测量要求与方法介绍给大家供参考!

关 键 词:工程竣工测量  测量监理  要求与方法

Requirements and Method of the Measurement Supervision after the Completion of the Railway Project
Jia Jun.Requirements and Method of the Measurement Supervision after the Completion of the Railway Project[J].Value Engineering,2011,30(5):51-51.
Authors:Jia Jun
Institution:Jia Jun(Hebei Water Resources and Hydropower Survey and Design Institute,Ministry of Water Resources,Tianjin 300250,China)
Abstract:In the Jin-Qin high-speed railway construction,the project involves the tunnel,bridge,roadbed,track,housing construction,etc..After the main project is completed,the commissioner will urge the completed measurement of construction unit.For the different projects,we should propose different measurement supervision requirements to provide valuable information for completion measurements of the project.This paper introduced the measurement supervision requirements and methods of Jin-Qin special supervision for reference!
Keywords:project completion measurement  measuring supervision  requirements and methods