摘    要:对于大断面软岩隧道施工,常规的台阶法开挖,极易造成拱顶大面积暴露、松动导致坍塌,此类情况均采用双侧壁导坑法设计。双侧壁导坑法开挖断面能够最大限度的保证施工安全,适合应用于大断面软岩隧道。

关 键 词:大断面软岩  双侧壁导坑法  隧道

Construction Technology of Large Cross-section Soft Rock Tunnel Excavation by Using Double Side Drift Method
Tian Zhixiang. Construction Technology of Large Cross-section Soft Rock Tunnel Excavation by Using Double Side Drift Method[J]. Value Engineering, 2012, 31(6): 73
Authors:Tian Zhixiang
Affiliation:Tian Zhixiang (China Railway 14th Bureau Group 3st Engineering Co.,Ltd.,Yanzhou 272100,China)
Abstract:For large cross-section of soft rock tunnel construction,the conventional excavation by using bench cut method easily caused the a large area exposure,loose,and even collapse.Excavation by using double side drift method can insure construction safety and is suitable for large cross-section of soft rock tunnel.
Keywords:large cross-section soft rock  double side drift method  tunnel