首页 | 本学科首页   官方微博 | 高级检索  
     检索      


USING BIDDING STATISTICS TO PREDICT COMPLETED CONSTRUCTION COST
Authors:MICHAEL G WRIGHT  TREFOR P WILLIAMS
Institution:Rutgers University
Abstract:The completed cost of a competitively bid construction project often exceeds the original low bid. This paper presents two models to predict completed construction cost based upon characteristics of the submitted bids. Data on completed projects were obtained from New Jersey Department of Transportation for 298 highway construction projects. Median bid and normalized median absolute deviation (NMAD) were selected from various bid characteristics as the best predictors of completed construction cost. Regression and neural network models were developed from the data. Both models have similar utility to predict completed costs. Due to ease of use, the regression model is preferred over the neural network model.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号