首页 | 本学科首页   官方微博 | 高级检索  
     检索      

试析有效减少工程变更,加强工程造价控制
引用本文:袁小玲.试析有效减少工程变更,加强工程造价控制[J].价值工程,2010,29(18):78-78.
作者姓名:袁小玲
作者单位:惠东县城市建筑工程总公司,惠东,516300
摘    要:基于工程建设项目设计变更和工程签证的区别、产生的原因及签发时应注意的事项,对减少设计变更和工程签证应采取的措施及工程结算时应采取的措施进行分析探讨。

关 键 词:设计变更  工程签证  产生原因  减少变更措施

Analysis on Effectively Reduce the Project Change, Strengthen Engineering Construction Cost Control
Yuan Xiaoling.Analysis on Effectively Reduce the Project Change, Strengthen Engineering Construction Cost Control[J].Value Engineering,2010,29(18):78-78.
Authors:Yuan Xiaoling
Institution:Yuan Xiaoling ( Huidong County Municipal, Architecture &Civil Engineering, General Corporation, Huidong 516300, China )
Abstract:Basing on the difference between engineering construction project design change and engineerign visa, the causing reasons and the noticing issues for visa, the paper develops an analysis on adopted measures of effectively reducing the project change and project calculating.
Keywords:design change  engineering visa  reason  reducing change measure
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号