摘    要:本文从郑州五号线地铁隧道工程出发,分析了该工程中土体沉降监测结果,根据结果,判断土体沉降变化规律,最后有针对性的提出了几点控制措施,以期为广大从业者提供有价值的参考借鉴。

关 键 词:盾构施工  隧道施工  地表沉降

Analysis and Control Measures of Surface Settlement during Shield Construction in Soft Ground
DING Chao. Analysis and Control Measures of Surface Settlement during Shield Construction in Soft Ground[J]. Value Engineering, 2020, 0(5): 169-170
Authors:DING Chao
Affiliation:(Urban Rail Transit Engineering Branch Co.,Ltd.of CTCE Group,Hefei 230023,China)
Abstract:This paper starts from the Zhengzhou Line 5 subway tunnel project,analyzes the monitoring results of soil settlement in the project,judges the law of soil settlement change based on the results,and finally proposes several control measures in order to provide valuable reference.
Keywords:shield construction  tunnel construction  surface settlement