金牛坪水电站二期泄水闸坝牛腿预制砼底模施工方案 |
| |
引用本文: | 蒙文芳.金牛坪水电站二期泄水闸坝牛腿预制砼底模施工方案[J].企业科技与发展,2009(7):171-173. |
| |
作者姓名: | 蒙文芳 |
| |
作者单位: | 广西广能工程有限公司,广西南宁530022 |
| |
摘 要: | 金牛坪水电站二期泄水闸坝牛腿施工采用预制砼底模的施工方法,加快了施工进度,保证了金牛坪水电站二期工程的顺利完成。
|
关 键 词: | 泄水闸坝 牛腿 预制砼底模 施工 金牛坪水电站 |
Construction of Prefabrication Reinforced Concrete Template for Drain Gate Dam of Second-phase Project in Jinniuping Hydropower Station |
| |
Authors: | MENG Wen-fang |
| |
Institution: | MENG Wen-fang ( Guangxi Guangneng Engineering Co., Ltd., Nanning Guangxi 530022) |
| |
Abstract: | The second-phase project in Jinniuping Hydropower Station, the construction method of prefabricate reinforced concrete template is applied to expedite the construction progress and ensure that this second-phase project is completed smoothly. |
| |
Keywords: | drain gate dam large prefabrication concrete template construction Jinniuping Hydropower Station |