BIM在预应力连续梁悬灌施工中的应用
引用本文:付廷达.BIM在预应力连续梁悬灌施工中的应用[J].中小企业管理与科技,2020(5):158-159.
作者姓名:付廷达
作者单位:中铁五局集团第五工程有限责任公司
摘    要:通过运用BIM技术对预应力混凝土连续梁悬灌施工进行优化,解决了跨吉信互通特大桥钢筋优化、混凝土多孔定点振捣、预应力管道定位、钢筋定位和泵送混凝土浇筑等施工难题,取得了明显的经济效果,可为类似工程的修建提供借鉴。

关 键 词:BIM  连续梁  钢筋定位  定点振捣

Application of BIM in the Cantilever Pouring Construction of Prestressed Continuous Beam
FU Ting-da.Application of BIM in the Cantilever Pouring Construction of Prestressed Continuous Beam[J].Management & Technology of SME,2020(5):158-159.
Authors:FU Ting-da
Institution:(No.5 Engineering Co.Ltd.,China Railway No.5 Engineering Group Co.,Ltd.,Changsha 410000,China)
Abstract:By using BIM technology to optimize the cantilever pouring construction of prestressed concrete continuous beam,this paper solves the construction problems such as steel bar optimization,concrete multi-hole fixed point vibration,prestressing pipe positioning,steel bar positioning and pumping concrete casting of the large cross-Jixin interworking bridge,and obtains obvious economic effects,which can provide reference for the construction of similar projects.
Keywords:BIM  continuous beam  steel bar positioning  fixed point vibration