大跨度整体现浇钢混叠合梁桥面板关键技术研究
引用本文:易运战.大跨度整体现浇钢混叠合梁桥面板关键技术研究[J].价值工程,2013,32(5):98-99.
作者姓名:易运战
作者单位:后勤工程检测中心,重庆,400041
摘    要:本桥全长216.25m,跨高速铁路施工,受天窗点的影响,混凝土无法一次性浇筑完成。项目部确定了先浇注边跨桥面板,再浇注中跨跨中区段桥面板,最后浇注墩顶桥面板的分段浇筑顺序,确保了钢梁叠合时面板与钢梁之间连接质量,希望能够给类似项目提供一些参考。

关 键 词:现浇钢混叠合梁  预应力施加  支点压重

Study on the Key Technology of Large-span Overall In-situ Steel-concrete Composite Beam Bridge Panel
YI Yun-zhan.Study on the Key Technology of Large-span Overall In-situ Steel-concrete Composite Beam Bridge Panel[J].Value Engineering,2013,32(5):98-99.
Authors:YI Yun-zhan
Abstract:The length of bridge is 216.25m,across the high-speed railway construction.Influenced by skylights,concrete cannot be pouring a time.Project Department determined the pouring order,first,pouring side across bridges panel,second pouring middle across section of bridge deck,last pouring top deck of subparagraph cast pier,to ensure the connection quality between panel and steel beam,hoping to provide some reference to similar projects.
Keywords:cast steel-concrete composite beams  prestress imposed  fulcrum press