首页 | 本学科首页   官方微博 | 高级检索  
     

谈加强设计变更和现场签证的管理提高企业经济效益的措施
引用本文:段伟列. 谈加强设计变更和现场签证的管理提高企业经济效益的措施[J]. 建筑管理现代化, 2002, 0(4): 63-64
作者姓名:段伟列
作者单位:哈尔滨排水有限责任公司
摘    要:在工程项目的施工过程中,发生设计变更和现场签证是相当普遍的,所以设计变变更和现场签证工作是工程承包管理中很重要的一项内容,本全面阐述了施工阶段中设计变更和现场签证的管理方法。

关 键 词:设计变更 现场签证 管理 企业 经济效益 预算编制 工程承包 施工单位
修稿时间:2002-11-21

The measure on improving the economic benefit of an enterprise through strengthening management of design alternation and on-site certificate
Duan Liewei. The measure on improving the economic benefit of an enterprise through strengthening management of design alternation and on-site certificate[J]. Construction Management Modernization, 2002, 0(4): 63-64
Authors:Duan Liewei
Abstract:Such events as design alternation and on-site certificate are quite ordinary during the operation of an engineering project. And thus design alternation and on-site certificate are very important in the management of project contractmanagement. The management methods of design alternation and on-site certificate are expounded all sided.
Keywords:design alternation  on-site certificate  management  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号