首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns
Authors:Jian Xiong  Li-ning Xing  Ying-wu Chen
Institution:1. Department of Management, College of Information System and Management, National University of Defense Technology, Changsha, 410073 Hunan, PR China;2. School of Engineering and Information Technology, University of New South Wales at the Australian Defence Force Academy, ACT 2600, Australia
Abstract:This study addresses robust scheduling for a flexible job-shop scheduling problem with random machine breakdowns. Two objectives – makespan and robustness – are simultaneously considered. Robustness is indicated by the expected value of the relative difference between the deterministic and actual makespan. Utilizing the available information about machine breakdowns, two surrogate measures for robustness are developed. Specifically, the first suggested surrogate measure considers the probability of machine breakdowns, while the second surrogate measure considers the location of float times and machine breakdowns. To address this problem, a multi-objective evolutionary algorithm is presented in this paper. The experimental results indicate that, compared with several other existing surrogate measures, the first suggested surrogate measure performs better for small cases, while the second surrogate measure performs better for both small and relatively large cases.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号