首页 | 本学科首页   官方微博 | 高级检索  
     检索      

杜鹃湖水库除险加固工程坝体薄壁混凝土防渗墙施工
引用本文:李华喜.杜鹃湖水库除险加固工程坝体薄壁混凝土防渗墙施工[J].价值工程,2011,30(15):108-109.
作者姓名:李华喜
作者单位:云南省普洱市景东彝族自治县水务局,景东,676200
摘    要:杜鹃湖水库除险加固工程采用冲击钻机成槽,利用抽砂筒排渣,泥浆护壁,直升导管法灌注混凝土施工。解决坝体及坝基渗漏问题,其效果显著,值得推广和应用。

关 键 词:土坝  混凝土防渗墙  施工

Construction of Thin Concrete Cutoff Wall of Prevention and Reinforcement Engineering for Dujuan Lake Reservoir Dam
Li Huaxi.Construction of Thin Concrete Cutoff Wall of Prevention and Reinforcement Engineering for Dujuan Lake Reservoir Dam[J].Value Engineering,2011,30(15):108-109.
Authors:Li Huaxi
Institution:Li Huaxi(Yunnan Provience Puer City Jingdong Yi Autonomous County Water Authority,Jingdong 676200,China)
Abstract:Prevention and reinforcement engineering of Dujuan lake reservoir uses percussion drill into slot,uses pumping sand tube for deslagging,and takes slurry to support,and makes use of helicopter catheter method to pour concrete,which has remarkable effect to solve dam and seepage problem,and is worth popularizing and applying.
Keywords:earth dam  concrete cutoff wall  construction  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号