实例分析高速公路箱型桥顶进施工技术
引用本文:李立艳.实例分析高速公路箱型桥顶进施工技术[J].价值工程,2010,29(12):101-101.
作者姓名:李立艳
作者单位:中铁十七局集团第三有限公司,石家庄,050000
摘    要:XX高速公路台南互通简易辅道10+907.3941-11.5箱形框架桥工程正交与SS高速公路394+950处,采用对顶法施工。该框架桥采用东西两幅对顶,两幅长度分别为15.025m、16.135m,首先进行西半幅的试顶和顶进工作,而后进行东半幅施工。施工中采用9套千斤顶和油泵。千斤顶用中原预应力工艺设备厂的YDD3000台座式千斤顶,油泵用同厂配套的ZB2×2/50型电动油泵。

关 键 词:箱形框架桥  工程  顶进工艺

The Case Study of Highway Box Bridge Jacking Construction Technique
Li Liyan.The Case Study of Highway Box Bridge Jacking Construction Technique[J].Value Engineering,2010,29(12):101-101.
Authors:Li Liyan
Institution:Li Liyan(China Railway No.17 Bureau Group,No.3 Co.,Ltd.,Shijiazhuang 050000,China)
Abstract:XX Highway Tainan exchange 10+907.394 1-11.5 box frame highway bridge is crossing with SS 394 +950 highway sections.Cross top construction method is used.The framework adopts cross roof,two lengths separately are 15.025m,16.135m.first are trial roof and jacking work,and then half roof construction with 9 set oil pump.Jacking is the Central Plains YDD3000 process equipment plant pedestal-type jack;pump adopts the same matching ZB2 × 2 / 50 electric pump.
Keywords:box frame bridge  engineering  jacking technology