首页 | 本学科首页   官方微博 | 高级检索  
     检索      

论提高采油工程规划方案的质量
引用本文:卫秀芬,周文庆.论提高采油工程规划方案的质量[J].石油工业技术监督,2010,26(11):30-33,47.
作者姓名:卫秀芬  周文庆
作者单位:[1]浙江大学地球科学系,浙江杭州310027 [2]大庆油田有限责任公司采油工程研究院,黑龙江大庆163453
摘    要:阐述了在采油工程规划方案编制中,采用"PDCA"质量环运行模式使质量管理体系贯穿于采油工程规划质量形成的全过程。对采油工程规划系统过程中单个过程及其之间的联系和相互作用进行连续的控制,保证了采油工程规划方案编制工作的顺利实施,提高了采油工程规划方案编制质量。

关 键 词:采油工程规划  质量  “PDCA”质量环运行模式

On the Improvement of Quality about Oil Production Engineering Planning Scheme
Wei Xiufen,Zhou Wenqing.On the Improvement of Quality about Oil Production Engineering Planning Scheme[J].Technology Supervision In Petroleum Industry,2010,26(11):30-33,47.
Authors:Wei Xiufen  Zhou Wenqing
Institution:Wei Xiufen, Zhou Wenqing
Abstract:It is expounded that,in the composition of oil production engineering planning scheme,"PDCA" quality chain operation model is adopted so as to make quality management system run through the whole process on the quality formation of oil production engineering planning scheme.The continuous control has been carried out for every single process,their association and interaction in the system of oil production engineering planning,which guarantees the normal implementation of composition work about oil produc-tion engineering planning scheme,and improves the composing quality of oil production engineering planning scheme.
Keywords:oil production engineering planning scheme  quality  PDCA quality chain operation model
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号