首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A comparison of MRP lot sizing methods considering capacity change costs
Authors:David A Collier
Abstract:Capacity management is the planning and leveling of resources required (load) against the resources available (capacity). In this study, the lot size models used by Material Requirements Planning (MRP) had a major effect on the work center load profiles generated by Capacity Requirements Planning (CRP). Therefore, the selection of lot size models for MRP systems is an important decision for capacity management as well as materials management.The results of this study highlight the operating characteristics of specific lot size models considering setup, inventory carrying, and capacity associated costs. For example, the Economic Order Quantity model and the Lot-For-Lot model in certain situations can help level load. The Periodic Order Quantity and Least Total Cost models especially for high cost structure ratios tend to result in erratic and lumpy work center load profiles. The reasons for such operating behavior are examined. Other concepts and relationships important to capacity management are discussed.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号