大盈江水电站蜗壳吊装施工技术研究
引用本文:陈忠伟,赵书杰.大盈江水电站蜗壳吊装施工技术研究[J].价值工程,2012,31(31):114-115.
作者姓名:陈忠伟  赵书杰
作者单位:中国水利水电第三工程局有限公司,西安,710032
摘    要:在水电站施工当中,特别是在前期机电埋件施工时,厂房桥机没有形成,土建施工为节约投入成本,不愿过多和过早投入起吊设备,甚至不投入起吊设备,钢筋预制件采用农民工扛到仓号,混凝土入仓利用地形高差采用溜槽入仓,造成机电埋件运输就位困难,大吨位埋件无法施工,被迫修改施工措施。

关 键 词:大盈江水电站  施工技术

The Volute Lifting Construction Technology of Yingjiang Hydropower Station
CHEN Zhong-wei , ZHAO Shu-jie.The Volute Lifting Construction Technology of Yingjiang Hydropower Station[J].Value Engineering,2012,31(31):114-115.
Authors:CHEN Zhong-wei  ZHAO Shu-jie
Institution:CHEN Zhong-wei;ZHAO Shu-jie(Sinohydro Bureau 3 CO.,LTD,Xi’an 710032,China)
Abstract:In the construction of hydropower station,especially in the early embedded parts construction,building bridge machine was not formed.In order to save costs,they are not willing to input excessive and premature lifting equipment in civil construction,even do not input,ask the migrant workers to lift the reinforced precast to the warehouse number,use the concrete chute warehousing according to the topographic height difference,so the electrical embedded parts transport is difficult to emplace,large-tonnage embedded parts cannot be constructed,so we must modify theconstruction measures.
Keywords:Yingjiang hydropower station  construction technology