客运专线基床表层级配碎石施工技术要点
引用本文:吴海涛,李鲁黑.客运专线基床表层级配碎石施工技术要点[J].价值工程,2011,30(23):95-95.
作者姓名:吴海涛  李鲁黑
作者单位:葛洲坝集团三峡实业有限公司,宜昌,443004
摘    要:铁路路基工程施工控制的关键在于基床,基床施工控制的重点又在于基床表层施工,客运专线施工质量要求严格,本文重点讲述了基床表层施工的控制要点。

关 键 词:客运专线  基床表层级配碎石

Construction Techniques of Subgrade Bed Surface Layer Graded Broken Stone of Passenger Dedicated Line
Wu Haitao,Li Luhei.Construction Techniques of Subgrade Bed Surface Layer Graded Broken Stone of Passenger Dedicated Line[J].Value Engineering,2011,30(23):95-95.
Authors:Wu Haitao  Li Luhei
Institution:Wu Haitao,Li Luhei(Gezhouba Group the Three Gorges Industrial Co.,Ltd.,Yichang 443004,China)
Abstract:The key of railway subgrade engineering construction control lies in subgrade bed,the key of bedding construction control lies in surface layer of subgrade bed construction.It is very strict for the requirement of construction quality of passenger dedicated line.Control points of surface layer of subgrade bed construction were mainly expounded.
Keywords:passenger dedicated line  subgrade bed surface layer graded broken stone  