250km客运专线铁路32m组合箱梁预制施工工艺
引用本文:覃繁星.250km客运专线铁路32m组合箱梁预制施工工艺[J].企业科技与发展,2009(11):120-123.
作者姓名:覃繁星
作者单位:中铁二院南宁分院,广西南宁530022
摘    要:文章以新建铁路客运专线某梁场32m组合箱梁施工技术为例,介绍了目前客运专线普遍采用的32m有砟轨道后张法预应力混凝土组合箱梁的预制施工工艺,为类似工程设计、施工提供参考。

关 键 词:客运专线  32m  简支箱梁  施工工艺

Craftsmanship of Prefabricated Techniques of 32 m Combined Box Girder on 250 km Passenger Special Railway
Authors:Qin Fan-xing
Institution:Qin Fan-xing (Nanning Branch of China Railway 2rd Engineering Group Co., Ltd., Nanning Guangxi 530022)
Abstract:Exemplified with the craftsmanship of 32 m combined box girder construction on a newly-buih passenger special railway, the article introduces the prefabricated technique craftsmanship that is applied to 32 m tensioning and prestress concrete combined box girder, which is popular with passenger special railways, for the reference of similar engineering designs and construction.
Keywords:passenger special railway  32 m  simply bearing box girder  construction craftsmanship