首页 | 本学科首页   官方微博 | 高级检索  
     检索      

江苏省大中型水库移民后期扶持项目监测评估方法研究
引用本文:金晶,李桂林,庞亚威,邵真真.江苏省大中型水库移民后期扶持项目监测评估方法研究[J].水利经济,2018,36(6):66-70.
作者姓名:金晶  李桂林  庞亚威  邵真真
作者单位:江苏省工程勘测研究院有限责任公司, 江苏 扬州 225002,江苏省水利厅, 江苏 南京 210029,江苏省工程勘测研究院有限责任公司, 江苏 扬州 225002,江苏省水利勘测设计研究院有限公司, 江苏 扬州 225127
摘    要:以江苏省大中型水库移民后期扶持政策实施为背景,研究水库移民后期扶持项目监测评估方法。基于国家及江苏省相关水库移民后期扶持政策、后期扶持项目管理规范等,梳理了江苏省水库移民后期扶持项目实施管理的框架体系和规范流程,并归纳了项目实施过程中存在的问题。针对这些已存在或潜在的问题,对项目监测评估方法进行研究,提出改进方案,以提高项目监测评估效率,为水库移民后期扶持项目问题的整改提供评估依据。

关 键 词:大中型水库  移民  后期扶持  江苏省
收稿时间:2018/8/3 0:00:00

Monitoring and evaluation methods for later-stage support projects of resettlement of large and medium-sized reservoirs in Jiangsu Province
JIN Jing,LI Guilin,PANG Yawei and SHAO Zhenzhen.Monitoring and evaluation methods for later-stage support projects of resettlement of large and medium-sized reservoirs in Jiangsu Province[J].Journal of Economics of Water Resources,2018,36(6):66-70.
Authors:JIN Jing  LI Guilin  PANG Yawei and SHAO Zhenzhen
Institution:Jiangsu Province Engineering Investigation and Research Institute Co., Ltd., Yangzhou 225002, China,Water Resources Department of Jiangsu Province, Nanjing 210029, China,Jiangsu Province Engineering Investigation and Research Institute Co., Ltd., Yangzhou 225002, China and Jiangsu Surveying and Design Institute of Water Resources Co., Ltd., Yangzhou 225127, China
Abstract:Based on the implementation of later-stage support policies for resettlement of large and medium-sized reservoirs in Jiangsu Province, the methods for monitoring and evaluating the later-stage support projects of resettlement are discussed. According to the national and provincial support policies and the management standards of support projects, etc. , the framework system and the management implementation process of the later-stage support projects in Jiangsu Province are investigated, and the problems in the implementation of these projects are summarized. In response to the existing or potential problems, the monitoring and evaluation methods for the later-stage projects are studied, and the relevant improvement schemes are proposed so as to promote the efficiency of monitoring and evaluation and to provide a more comprehensive and concrete basis for the rectification and improvement of problems in the later-stage support projects of resettlement of reservoirs.
Keywords:large and medium-sized reservoir  resettlement  later-stage support  Jiangsu Province
本文献已被 CNKI 等数据库收录!
点击此处可从《水利经济》浏览原始摘要信息
点击此处可从《水利经济》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号