首页 | 本学科首页   官方微博 | 高级检索  
     检索      

房地产项目开发时机与土地闲置问题研究——基于34个大中城市面板数据的检验
引用本文:翟东,严伟,王媛.房地产项目开发时机与土地闲置问题研究——基于34个大中城市面板数据的检验[J].中国土地科学,2015,29(4):41-48.
作者姓名:翟东  严伟  王媛
作者单位:(浙江大学土木工程管理研究所,浙江 杭州 310058)
摘    要:研究目的:研究市场不确定性对房地产项目开发时机的影响,检验实物期权的关键假说,为破解土地闲置问题提供政策理论依据。研究方法:计量经济模型。研究结果:(1)市场不确定性每提高1个单位的标准差将使得房地产项目的开工量降低11.54%;(2)M2同比增速提高1个单位标准差,项目的开工量将增加7.20%;3个月央票利率提高1个单位的标准差,项目开工量将下降10.65%。研究结论:(1)市场不确定性的提高会显著延迟项目开发时机,验证了实物期权的关键假说,表明破解土地闲置问题,重在降低房价波动幅度。(2)政策因素对开发商投资决策有重要影响,间接地反映了货币政策对闲置土地调控的有效性。

关 键 词:土地经济  实物期权  面板数据模型  项目开发时机  土地闲置
收稿时间:2014-04-16
修稿时间:2015-03-07

Timing Sequence of Real Estate Project Development and the Problem of Land Vacancy: An Empirical Test based on Panel Data of 34 Metropolises in China
ZHAI Dong,YAN Wei,WANG Yuan.Timing Sequence of Real Estate Project Development and the Problem of Land Vacancy: An Empirical Test based on Panel Data of 34 Metropolises in China[J].China Land Science,2015,29(4):41-48.
Authors:ZHAI Dong  YAN Wei  WANG Yuan
Institution:(Institute of Construction Management, Zhejiang University, Hangzhou 310058, China)
Abstract:The purpose of this paper is to study the impacts of market uncertainty on the timing to develop real estate project, and to test the key hypothesis of real options, and to provide theoretical basis to solve the land vacancy. Method employed is econometric model. The results indicate that one-standard deviation increased in the market uncertainty reduces the new constructions of real estate projects by 11.54%. A one-standard-deviation increase in M2 growth increases the amount of new project start by 7.20%. A one-standard-deviation increase in 3-month central bank bills rate reduces the new constructions by 10.65%. It is concluded that the increase of market uncertainty would significantly delay the timing sequences of project development. The key hypothesis of real options is confirmed. The key to tackle the problem of idle vacancy is to lower price fluctuation. Policy factors have an important impact on the decision of project development, which indirectly reflects the effectiveness of monetary policy.
Keywords:land economy  real options  panel data model  timing decision of project development  land vacancy
本文献已被 CNKI 等数据库收录!
点击此处可从《中国土地科学》浏览原始摘要信息
点击此处可从《中国土地科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号