排序方式: 共有135条查询结果,搜索用时 0 毫秒
11.
《Socio》2021
Traffic congestion is an unpreventable problem to avoid in a transportation network and it has negative effects on traffic accident, time wasting, traffic delay and safety problem. Besides, in transportation networks, drivers do not want to deal with traffic jam while traversing between specified origin-destination pair. Therefore, traffic assignment (TA) is imperative to improve traffic management, transportation safety, time, and cost savings. System Optimum Traffic Assignment Problem (SOTAP) is a kind of TA model which aims to minimize the total system travel time on the network, and satisfies the flow conservation constraints. To model the SOTAP more realistically, the imprecise parameters can be taken as fuzzy. Therefore, in this paper, we focus on converting the conventional SOTAP to a fuzzy quadratic programming problem (QPP) which is named System Optimum Fuzzy Traffic Assignment Problem (SOFTAP). Here, link travel time is expressed with BPR function as generally used in the literature by converting to fuzzy except link-dependent parameters. Thus, the nonlinear objective function of SOFTAP is expressed in terms of fuzzy link flows and fuzzy link travel times. A solution approach from the literature is modified to the reconstructed SOFTAP. 相似文献
12.
企业BPR实施过程中的风险分析 总被引:2,自引:0,他引:2
企业实施业务流程重组(BPR)是一个南风险高收益的项目。针对目前国内企业BPR风险性高,成功率低的情况,我 们有必要对实施BPR过程中的各种风险因素进行分析研究,并找出解决方案,以期对我国企业顺利进行企业流程再造有所帮 助。 相似文献
13.
章介绍了业务流程再造的基本内涵,并就房地产项目的投资决策分析流程进行重点研究,对房地产项目的投资决策分析流程进行了重新构建。 相似文献
14.
A business process reengineering (BPR) project relating to the materials management function of a cement manufacturing plant is presented in this paper. The BPR project evolved out of an organisation development (OD) intervention initiative. Such an intervention aimed at improving value innovation capability of materials management professionals of a large cement manufacturing plant in India. The proposition here is that the value metrics relate to inside-in value innovations in order to deliver inside-out value to the customers in the face of fierce competition in Indian Cement industry. Materials of all types used in a cement plant constitute 60–70% of the total cost and hence the effective operations of procurement and inventory are the critical success factors for strategic value innovations and thereby competitiveness. The primary emphasis in this project was on learning and implementation, by creating an urgency for instilling responsible leadership and building organic partnership through knowledge networking. 相似文献
15.
首先,引入了知识增加值概念,介绍了运用知识增加值评价业务流程质量的三种方法及其步骤。其次,为了更深刻地理解知识增加值,通过一个案例来说明知识增加值的核算步骤,并且与传统的作业成本分析法进行比较。最后,指出了知识增加值在实际应用过程中可能碰到的问题。但是,可以确信,随着知识经济的发展,知识增加值这种新的方法是会得到更为广泛的应用。 相似文献
16.
17.
18.
企业的业务流程重组(BPR)最基本的思想在于充分利用信息系统的潜能以及面向过程的人员与组织管理,对企业业务流程进行根本性的思考和再设计,从而促使经营管理水平得到改善。详细阐述了某矿业集团公司ERP项目实施过程中的采购模式的重建和业务流程再造。 相似文献
19.
基于BPR理论的企业重组 总被引:9,自引:0,他引:9
首先介绍BPR基本理论,接着从企业经营过程的具体实际出发,提出了基于BPR理论的企业重组,引出了企业重组的原则,内容,重组模型在企业中实施的具体步骤。 相似文献
20.
杜栋 《世界标准化与质量管理》2008,(4):7-10
文章分析了6σ和企业流程再造(BPR)的共性和一致性,指出6σ可为BPR提供规范化原则和标准化框架,可为BPR提供更加有效的步骤和工具。最后,对基于6σ的BPR具体实施问题作了探讨。 相似文献