全文获取类型
收费全文 | 275篇 |
免费 | 9篇 |
国内免费 | 1篇 |
专业分类
财政金融 | 1篇 |
工业经济 | 27篇 |
计划管理 | 123篇 |
经济学 | 2篇 |
综合类 | 4篇 |
贸易经济 | 7篇 |
农业经济 | 2篇 |
经济概况 | 11篇 |
水利工程 | 108篇 |
出版年
2021年 | 1篇 |
2020年 | 4篇 |
2019年 | 1篇 |
2017年 | 1篇 |
2016年 | 1篇 |
2015年 | 15篇 |
2014年 | 29篇 |
2013年 | 11篇 |
2012年 | 19篇 |
2011年 | 48篇 |
2010年 | 44篇 |
2009年 | 33篇 |
2008年 | 16篇 |
2007年 | 15篇 |
2006年 | 11篇 |
2005年 | 7篇 |
2004年 | 6篇 |
2003年 | 11篇 |
2002年 | 7篇 |
2001年 | 1篇 |
2000年 | 2篇 |
1997年 | 1篇 |
1990年 | 1篇 |
排序方式: 共有285条查询结果,搜索用时 15 毫秒
1.
Yu. A. Radin I. A. Grishin T. S. Kontorovich O. B. Panshina A. V. Chugin 《Power Technology and Engineering (formerly Hydrotechnical Construction)》2006,40(2):113-119
Problems arising with connecting the second exhaust-heat boiler to the first exhaust-heat boiler under load in the case of
flow circuits of combined-cycle plants of type PGU-450 are considered. Similar problems exist for two-boiler single-turbine
units of type PGU-325 and for two-boiler single-turbine units of traditional steampower plants with an output of 200–300 MW
upon connection of the second furnace of a two-furnace boiler to the operating first furnace. Analysis of the temperature-induced
stressed state and of the cyclic strength of thick-walled elements of the steam-water conduit of PGU-450 and of two-furnace
boilers of two-boiler single-turbine units with an output of 200–300 MW (the check valve, the inlet header of the water economizer)
is used for determining the steam temperature differences in the high-pressure conduits to the steam turbine and the order
of connection of the second exhaust-heat boiler to the operating fist one. Modes of enabling a two-boiler single-turbine unit
of a combined-cycle plant, which are most “rigid” from the standpoint of thermal strength, are determined.
__________
Translated from élektricheskie Stantsii, No. 2, February 2006, pp. 11–17. 相似文献
2.
说明电厂锅炉炉膛温度及结焦直接影响锅炉正常运行及安全;给出了基于多探测器的锅炉反应温度红外成像实时测温系统的系统结构、系统原理、系统标定和温度测定方法。 相似文献
3.
E. V. Chernyshev E. N. Veprov V. A. Petrov S. L. Bogdanov T. Yu. Levina T. I. Petrova V. I. Kashinskii A. A. Zonov A. E. Verkhovskii 《Power Technology and Engineering (formerly Hydrotechnical Construction)》2006,40(1):34-37
Results of a study of tube specimens cut from hot-water boilers show that film-forming octadecyl amine (ODA) used in the process
of preservation removes deposition from the surface of the metal. An ODA film is preserved on the surface after repeated washing
of the latter with hot water. The concentration of chlorides at the surface of the metal after treatment with ODA is lower
than before the treatment.
__________
Translated from élektricheskie Stantsii, No. 11, November 2005, pp. 15–18. 相似文献
4.
N. N. Man’kina A. V. Kirilina O. V. Ovechkina B. G. Lyudomirskii B. G. Rubanov Yu. G. Tikhomirov T. Sh. Zakirov 《Power Technology and Engineering (formerly Hydrotechnical Construction)》2006,40(5):307-315
Studies conducted on two power-generating units at the Kharanorskaya SAPP relative to the steam-water-oxygen passivation,
preservation, and partial cleaning of all boiler-heating surfaces, including the surfaces of the reheater, and passivation
of the surfaces of the high-pressure heaters on the steam and water sides by the steam-oxygen method, as well as partial passivation,
preservation, and cleaning of turbine blading are presented.
__________
Translated from élektricheskie Stantsii, No. 6, pp. 56–64, May, 2006. 相似文献
5.
针对四角切圆锅炉水平烟道上普遍存在烟温偏差的情况,在河北国华定洲发电厂新建锅炉开展了冷态空气动力场试验,重点研究炉膛出口烟气流速分布情况。试验证明,通过调整分离燃尽风(SOFA)喷嘴的角度,能有效改变炉膛出口气流的分布,保证左、右烟气流速均匀,可满足锅炉正常运行的要求。 相似文献
6.
煤改气是加快调整工业锅炉能源结构、改善大气环境质量的重要措施之一。燃气运营商欲开拓工业锅炉煤改气市场,应正确辨别终端市场客户的类别。从行业特性、企业特性、锅炉状况和客户开发潜力4个方面构建工业锅炉煤改气客户细分评价指标体系,用AHP-修正熵组合赋权方法确定评价指标权重,建立工业锅炉煤改气客户细分模型并开展应用。评价结果兼顾客观属性与主观偏好,符合客观实际,可为燃气运营商开展差异化管理,采取多元化营销模式提供决策依据。 相似文献
7.
火电厂锅炉房真空负压吸尘系统设计 总被引:1,自引:0,他引:1
文章介绍了火电厂锅炉房真空负压系统压力损失的计算及负压吸尘装置的选择。 相似文献
8.
胜利发电厂^#1锅炉在2008年7月小修期间,发现锅炉水冷壁管存在大面积高温腐蚀现象,经检查共有129根水冷壁管减薄超标,小修期间予以更换。通过对该厂^#1锅炉水冷壁管高温腐蚀现象的分析,找出了产生高温腐蚀的原因,制订了防范措施,消除了锅炉安全运行的隐患。 相似文献
9.
V. I. Shchelokov A. A. Smyshlyaev Yu. I. Lafa V. I. Serik 《Power Technology and Engineering (formerly Hydrotechnical Construction)》2004,38(6):346-349
Experience of operation of tubular air heaters (TAH) on twelve boilers of type PK-38 for 150-MW power units of the Berezovskaya GRÉS (state regional power plant) in Belarus is presented. Coal-fired, gas-fired, and oil-fired operation modes with updating tubular air heaters in a cascade layout are described. Advantages of the cascade layout and conditions for reliable, efficient, and long-term service of the TAH are shown.Translated from Élektricheskie Stantsii, No. 9, September 2004, pp. 20–23. 相似文献
10.
介绍了燃煤电厂应用低氮燃烧技术(LNB)与烟气脱硝技术(SCR)对褐煤电厂锅炉进行改造后,在不降低锅炉效率的情况下,实现了NOx浓度达标排放,取得了良好的经济、环保效果。 相似文献