首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Impact of Continuous Climb Operations in ATC workload. Case-study Palma airport
Institution:1. Institute for Transport and Development, School of International Business, University of Applied Sciences, Werderstrasse 73, 28199, Bremen, Germany;2. Department of Economics, Monash University, Clayton Victoria, 3800, Australia and School of Business and Tourism, Southern Cross University, Australia;3. Centre for Logistics and Supply Chain Management, University of Luxembourg, L-1511, Luxembourg;1. School of Economy and Management, Beihang University, Beijing, China;2. Civil Aviation Management Institute of China, Beijing, China;3. Collaborative Innovation Center for Aviation Economy Development, Zhengzhou university of Aeronautics, Henan Province, China
Abstract:This research assesses the impact of the integration of Continuous Climb operations (CCOs) on Air Traffic Control (ATC) workload. The methodology encompasses different modules: CCO, standard departing and arriving trajectories extracted from an external database, an ad-hoc algorithm for detecting and solving conflicts, and an ATC-workload model with the inclusion of CCO-task modifications. Monte Carlo simulations evaluates different combinations of these modules. Then, a sensitivity analysis is performed to evaluate two parameters: the impact of the calibration of the maximum ATC workload and the percentage increase of the CCO tasks on the ATC workload. The methodology is applied to a case study at Palma airport in Spain. Extensive numerical simulations are executed based on the integration of CCOs into the system from 0% to 100%. The integration of CCOs implies the increase of the ATC workload in the Control Tower (TWR) and the reduction in the Approach Control Centre (APP). The sensitivity analysis shows that the decrease in the increase of CCO-task workload barely affects the number of CCOs that can be operated without exceeding the workload limits. Conversely, the reduction of the ATC workload calibration allows the integration of CCOs around 50% in the case of 90% TWR calibration and up to 100% in the case of 80%.
Keywords:Continuous climb operations  Air transport  Air traffic management  ATC workload
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号