浅谈48+3×80+48悬浇连续梁施工工艺
引用本文:刘云生.浅谈48+3×80+48悬浇连续梁施工工艺[J].价值工程,2011,30(9):153-154.
作者姓名:刘云生
作者单位:中铁九局集团隧道分公司,沈阳,110013
摘    要:结合工程实例介绍预应力悬浇连续梁的现浇施工工艺,全面总结了从现浇支架的搭设、轻型菱形挂篮的拼装、主墩与梁体的临时固结,到分段预应力钢束张拉、灌浆、封锚全过程的施工工艺,提供了相应的施工方法、预应力张拉等各种技术数据,旨在对今后类似连续梁的施工起到借鉴作用。

关 键 词:悬浇连续梁  施工工艺  技术参数

Discussion on 48+3×80+48 Continuous Beam Hanging Pouring Construction Technology
Liu Yunsheng.Discussion on 48+3×80+48 Continuous Beam Hanging Pouring Construction Technology[J].Value Engineering,2011,30(9):153-154.
Authors:Liu Yunsheng
Institution:Liu Yunsheng(China Railway No.9 Group Tunnel Branch,Shenyang 110013,China)
Abstract:Combining the engineering project,the paper introduced the pre-stressed continuous beam hanging cast-in-place pouring technology.Comprehensively summarized the cast-in-place support setting up,the assembling of light diamond basket,the temporary solidifying of host pillar and beam,the partition pre-stressed steel,grouting and seal of anchor.Related construction method and all kinds of technical data of pre-stress are proposed to provide reference for future silimar continuous beam construction.
Keywords:continuous beam hanging pouring  construction process  technical parameter  