瀑布沟水电站坝基固结灌浆试验
引用本文:胡晶,李焰.瀑布沟水电站坝基固结灌浆试验[J].湖北水力发电,2009(4):46-49,61.
作者姓名:胡晶  李焰
作者单位:胡晶(葛洲坝集团湖北清江建设有限公司,湖北,宜昌,443002);李焰(湖北葛洲坝试验检测有限公司,湖北,宜昌,443002) 
摘    要:瀑布沟水电站工程设计中,拟对坝基岩体及覆盖层采用固结灌浆处理,大规模施工前,先进行灌浆试验,试验采用“孔口封闭、孔内循环、一段灌注法”施工。试验成果满足设计要求。

关 键 词:瀑布沟水电站  坝基  固结灌浆  灌浆试验

Consolidation grouting test for dam foundation of Pubugou Hydropower Station
HU Jing,LI Yan.Consolidation grouting test for dam foundation of Pubugou Hydropower Station[J].Hubei Water Power,2009(4):46-49,61.
Authors:HU Jing  LI Yan
Institution:1.Hubei Qingjiang Construction Co.;Ltd.;Gezhouba Group Corp.;Yichang 443002;China;2.Hubei Gezhouba Testing Co.;China
Abstract:According to the engineering design,the foundation rock and covering strata must be strengthened by consolidation grouting.The grouting work is tested before the dam construction start,and the grouting process is in compliance with "blocking up the top of the grouting holes,the grout circulates within the holes,one grouting section be grouted at one time".The test result meets the needs of design.
Keywords:Pubugou Hydropower Station  dam foundation  consolidation grouting  grouting test  