首页 | 本学科首页   官方微博 | 高级检索  
     检索      

云阳山隧道断层破碎带初支大变形原因分析及处理方案
引用本文:杨昵刚.云阳山隧道断层破碎带初支大变形原因分析及处理方案[J].企业技术开发,2012(10):59-61,76.
作者姓名:杨昵刚
作者单位:中铁五局(集团)有限公司衡茶吉铁路工程指挥部
摘    要:文章阐述了新建衡茶吉铁路云阳山隧道断层破碎带初支大变形的原因以及施工处理方案,可为今后类似工程提供参考。

关 键 词:断层破碎带  大变形  原因分析  施工处理

Cause analysis and treatment scheme for the large deformation of the primary support of the fault fracture zone in Yunyangshan tunnel
YANG Ni-gang.Cause analysis and treatment scheme for the large deformation of the primary support of the fault fracture zone in Yunyangshan tunnel[J].Technological Development of Enterprise,2012(10):59-61,76.
Authors:YANG Ni-gang
Institution:YANG Ni-gang(Hengchaji Railway Engineering Headquarter of China Railway No.5 Engineering Group Co.,Ltd.,Zhuzhou,Hunan 412400,China)
Abstract:This paper explains the cause of the large deformation of t he primary support of the fault fracture zone in Yunyangshan Tunnel of the newly-built Hengchaji Railway and the construction treatment scheme,which can provides reference for similar projects in future.
Keywords:fault fracture zone  large deformation  cause analysis  construction treatment
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号