某核电站一期工程水土流失防治要点分析
引用本文:邹竞成. 某核电站一期工程水土流失防治要点分析[J]. 价值工程, 2011, 30(28): 53-54
作者姓名:邹竞成
作者单位:广东省电力设计研究院,广州,510663
摘    要:某核电站一期工程位于滨海地区,项目占地面积广,施工时间长,点线面工程兼备。水土保持工作应重视防洪排水,并需要根据不同的建设类别、施工时序、扰动特点进行防治分区,制定相应的分区水保措施,同时在整个施工过程中应重视水土保持监测,并根据监测的结果,及时调整或改进水土保持措施。

关 键 词:滨海  核电站  水土保持  分区防治

Analysis of Soil Erosion Control Points in the First Phase of Engineering of a Nuclear Power Plant
Zou Jingcheng. Analysis of Soil Erosion Control Points in the First Phase of Engineering of a Nuclear Power Plant[J]. Value Engineering, 2011, 30(28): 53-54
Authors:Zou Jingcheng
Affiliation:Zou Jingcheng (Guangdong Electric Power Design Institute,Guangzhou 510663,China)
Abstract:The first-stage project of Nuclear powerplant is by the sea.It is a point-line-plane combined project of broad area,long-term of construction work.The water and soil conservation work should put more emphasis on the following :prevention of floods and drainage of floodwater;make control sectors and the conservation measures to each sector on the basis of construction category,schedule,disturbance characteristics;monitoring during the construction process;adjust or promote the measures timely according to th...
Keywords:by the sea  Nuclear powerplant  water and soil conservation work  zoning control  