首页 | 本学科首页   官方微博 | 高级检索  
     检索      

运营线路隧道溶洞处理及隧道内线路加固技术
引用本文:王磊,兰天仕.运营线路隧道溶洞处理及隧道内线路加固技术[J].企业科技与发展,2012(14):99-101.
作者姓名:王磊  兰天仕
作者单位:中铁二十五局集团第四工程有限公司,广西柳州,545007
摘    要:已开通运营的铁路隧道底部出现岩溶洞穴,使得线路部分悬空,且存在岩溶洞穴涌水,危及铁路行车安全,致使铁路停止运营。因此,制定合理、科学、有效的线路加固方案,使线路尽快正常开通,对溶洞进行有效的处理以消除安全隐患极为重要。本文根据铁路隧道溶洞结构的具体情况,介绍了隧道内线路加固及溶洞处理方法,对此类溶洞处理提供一些借鉴。

关 键 词:运营铁路  溶洞处理  线路加固  施工技术  受力验算

On the Treatment of Limestone Cave of Operating Railway and the Technique of Rail Reinforcement in Tunnel
Authors:WANG Lei  LAN Tian-shi
Institution:(China Railway 25th Bureau Group,No.4 Engineering Co.,Ltd.,Liuzhou Guangxi 545007)
Abstract:Limestone cave is found at the bottom of operating railway tunnel.Part of the rail is suspended and water flows into the cave,which has hazarded the railway and causes to stop operating.Therefore,it is essential to step up a reasonable, scientific and effective rail reinforcement scheme to operate the railway and eliminate potential risk.According to the limestone cave structure in tunnel,the paper introduces a method to reinforce the rail and treat the cave in hope of offer some experience to similar limestone cave treatment.
Keywords:operating railway  the treatment of limestone cave  rail reinforcement  construction technique  stress check calculation
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号