首页 | 本学科首页   官方微博 | 高级检索  
     

建设工程项目实施阶段后评价体系与方法探讨
引用本文:吴学武. 建设工程项目实施阶段后评价体系与方法探讨[J]. 基建优化, 2007, 28(2): 9-10
作者姓名:吴学武
作者单位:广东工业大学,广州,510006
摘    要:建设工程项目实施阶段后评价的目的是为提高项目管理水平和对项目管理者进行客观公正的考核提供依据。项目实施阶段后评价的体系可按项目管理的内容和过程确定,应采用过程评价与效果评价相结合,分析评价与对比评价相结合,定性评价与定量评价相结合,业主方评价与承包方评价相结合,评价与建议相结合的方法。

关 键 词:建设工程项目  实施阶段  后评价  体系  方法
文章编号:1000-7717(2007)02-0009-02
修稿时间:2007-01-18

An Approach to the Post-evaluating System and Methods of Civil Engineering Construction Projects in Executive Period
WU Xue-wu. An Approach to the Post-evaluating System and Methods of Civil Engineering Construction Projects in Executive Period[J]. Optimization of Capital Construction, 2007, 28(2): 9-10
Authors:WU Xue-wu
Abstract:The post-evaluation in executive period of civil engineering construction projects aims to promote the project management and to provide a foundation of examining the project managers fairly and objectively.The evaluating system of it could be defined by the content and the course of the project management. Methods should be taken in the evaluation that combines process evaluation and effective evaluation,analyzing evaluation and contrast evaluation,property evaluation and quantity evaluation,owner-side evaluation and contract-side evaluation,evaluation and suggestion.
Keywords:construction projects  executive period  post-evaluation  system  methods
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号