首页 | 本学科首页   官方微博 | 高级检索  
     


Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework
Affiliation:1. Department of Business Administration, Chaoyang University of Technology, Taichung 413, Taiwan;2. Department of Business Administration, National Changhua University of Education, Changhua 500, Taiwan
Abstract:This study employs an alternative approach to determine common production cycle time for a multi-item production system with discontinuous deliveries and failure in rework. A straightforward approach using algebraic derivation is proposed here to reexamine a specific common cycle time problem studied by Chiu et al. (2013a,b), where they used the conventional method with the need of applying first-order and second-order differentiations to system cost function for proof of convexity before deriving the optimal common cycle time. The result of this study is confirmed to be identical to that was obtained in Chiu et al. (2013a,b). This alternative approach enables practitioners who may not have sufficient knowledge of differential calculus to manage the real-life multi-item production systems more effectively.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号