合理利用保险和非保险方法应对公路工程进度风险
引用本文:贾楠.合理利用保险和非保险方法应对公路工程进度风险[J].价值工程,2014(1):89-90.
作者姓名:贾楠
作者单位:中国石油天然气管道工程有限公司,廊坊065000
摘    要:对公路工程进度风险进行识别评价之后,要对其加以防范控制。本文旨在介绍风险管理的非保险方法和保险方法,然后根据公路工程进度风险中的不同情况,合理利用两种方法,实现风险减小甚至消除风险的目的。

关 键 词:公路工程进度风险  非保险方法  保险方法

The Rational Utilization of Insurance Method and Non-insurance Method for Coping with Highway Project Schedule Risk
JIA Nan.The Rational Utilization of Insurance Method and Non-insurance Method for Coping with Highway Project Schedule Risk[J].Value Engineering,2014(1):89-90.
Authors:JIA Nan
Institution:JIA Nan ( CPPE, Langfang 065000, China )
Abstract:After the identification and evaluation of highway project schedule risk, we should prevent and control it. This paper aims to introduce the risk management method of non insurance and insurance, and then uses the two kinds of methods rationally according to the different situation of highway project schedule risk, to reduce the risk or even eliminate it.
Keywords:risk in the highway proiects schedule  non insurance method  insurance method