首页 | 本学科首页   官方微博 | 高级检索  
     检索      

工程建设进度控制剖析
引用本文:彭家胜.工程建设进度控制剖析[J].价值工程,2014(5):65-66.
作者姓名:彭家胜
作者单位:重庆市涪陵区开发公司,重庆408000
摘    要:本文从三个方面对工程建设进度控制进行剖析:一是工程建设进度控制概述、内涵与特点;二是影响工程建设进度控制的因素,如业主方因素、勘察与设计方因素、施工方因素、工程相关参建单位方因素;三是工程进度控制的方法与措施。

关 键 词:工程建设  进度  控制

Progress Control of Engineering Construction
PENG Jia-sheng.Progress Control of Engineering Construction[J].Value Engineering,2014(5):65-66.
Authors:PENG Jia-sheng
Institution:PENG Jia-sheng ( Fuling Development Company of Chongqing, Chongqing 408000, China )
Abstract:This paper analyzes the progress control of engineering construction from three aspects: First, the outline, content and features of the progress control of engineering construction; Second, the influencing factors such as the owner side, survey and design side, the construction side and the engineering construction participants side; Third, methods and measures of the progress control of engineering construction.
Keywords:engineering construction  progress  control
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号