首页 | 本学科首页   官方微博 | 高级检索  
     检索      

景电工程梯级泵站运行区间流量调节探索
引用本文:李竟恒.景电工程梯级泵站运行区间流量调节探索[J].价值工程,2010,29(32):170-170.
作者姓名:李竟恒
作者单位:甘肃省景泰川电力提灌管理局,白银730400,China
摘    要:阐述梯级泵站运行区间流量调节的重要性,并根据景泰川电力提灌工程运行状况,提出造成区间流量不平衡的原因、不利因素以及采取的措施和发展举措。为电力提灌工程的调度运行和管理提供了理论参考。

关 键 词:梯级泵站  流量调节  探索

Exploration on Flow Regulation in the Operation Range of Cascade Pumping Station in Jingdian Project
Li Jingheng.Exploration on Flow Regulation in the Operation Range of Cascade Pumping Station in Jingdian Project[J].Value Engineering,2010,29(32):170-170.
Authors:Li Jingheng
Institution:(Gansu Jingtaichuan Electric Power Lift Irrigation Authority,Baiyin 730400,China)Li Jingheng
Abstract:This paper discusses the importance of the flow adjustment in the operation range of cascade pumping station,and puts forward reasons causing flow imbalance in the range,the adverse factors and the measures and development initiatives,providing theoretical reference for scheduling operation and management of power lift irrigation project.
Keywords:cascade pumping station  flow regulation  exploration
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号