Z核电站核岛UPS设备设计进度计划及控制研究
引用本文:林建. Z核电站核岛UPS设备设计进度计划及控制研究[J]. 价值工程, 2012, 31(22): 79-81
作者姓名:林建
作者单位:中广核工程有限公司,深圳,518124
摘    要:采用工作分解结构分解了Z核电站核岛UPS设备设计项目,并用关键路径法编制了该项目进度,结合项目特点,基于PDCA控制流程对项目实施进度控制,确保项目顺利实施。

关 键 词:工作分解结构  关键路径法  PDCA  核电站  UPS

The Research of Project Schedule Plan and Control on UPS Design in Nuclear Island of Z Nuclear Power Plant
LIN Jian. The Research of Project Schedule Plan and Control on UPS Design in Nuclear Island of Z Nuclear Power Plant[J]. Value Engineering, 2012, 31(22): 79-81
Authors:LIN Jian
Affiliation:LIN Jian(China Nuclear Power Engineering Company,LTD.,Shenzhen 518124,China)
Abstract:This paper uses work breakdown structure to break down the UPS design project in nuclear island of Z nuclear power plant,uses critical path method to build the schedule of the project,combined with the characteristics of the project,based on the PDCA control flow,controls the progress of project implementation and ensures the smooth implementation of the project.
Keywords:work breakdown structure  critical path method  PDCA  nuclear power plant  UPS