首页 | 本学科首页   官方微博 | 高级检索  
     检索      

龙潭河特大桥高墩控制测量的实践与思考
引用本文:左发春.龙潭河特大桥高墩控制测量的实践与思考[J].价值工程,2011,30(30):77-77.
作者姓名:左发春
作者单位:湖北省宜昌至巴东高速公路建设指挥部,宜昌,443700
摘    要:从湖北省沪蓉西高速公路龙潭河特大桥施工实际出发,分析了高墩控制测量的影响因素,制定测量控制精度的方案,确保了高墩各项控制指标的精确实现,其方法和措施可供同行参考。

关 键 词:高墩  控制测量  精度

Practice and Thinking on Control Survey of High Pier of Longtanhe Super-Large Bridge
Zuo Fachun.Practice and Thinking on Control Survey of High Pier of Longtanhe Super-Large Bridge[J].Value Engineering,2011,30(30):77-77.
Authors:Zuo Fachun
Institution:Zuo Fachun(Hubei Provincial Yichang to Badong Expressway Construction Headquarters,Yichang 443700,China)
Abstract:Starting from construction practice of Longtanhe super-large bridge in Hubei provincial Shanghai-Chengdu expressway,the influence factors of control measurements of high pier were analyzed,and the scheme of the measurement control accuracy was formulated,which ensures exact implementation of control targets of high pier.The methods and measures can provide reference for the peer.
Keywords:high pier  control measure  accuracy  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号