金平水电站沥青混凝土心墙堆石坝设计
引用本文:姜华.金平水电站沥青混凝土心墙堆石坝设计[J].湖北水力发电,2007(6):27-31.
作者姓名:姜华
作者单位:中国水电顾问集团中南勘测设计研究院,湖北宜昌443002
摘    要:金平水电站沥青混凝土心墙堆石坝坝高91.5 m,坝址覆盖层很厚,设计中对坝基进行振冲碎石桩加固,采用一道全封闭混凝土墙防渗.坝坡稳定采用毕肖普法和瑞典圆弧法计算,坝体和坝基的应力和变形采用三维有限元增量法计算.

关 键 词:沥青混凝土心墙堆石坝  基础处理  坝体稳定  坝基和坝体应力和变形
文章编号:1671-3354(2007)06-027-05
收稿时间:2007-06-26
修稿时间:2007年6月26日

Design of rockfill dam with asphalt-concrete core of Jinping Hydropower Station
JIANG Hua.Design of rockfill dam with asphalt-concrete core of Jinping Hydropower Station[J].Hubei Water Power,2007(6):27-31.
Authors:JIANG Hua
Abstract:The 91.5 m high rockfill dam with asphalt-concrete core of Jinping Hydropower Station is built on complex foundation with thick overburden layers; the dam foundation is reinforced with vibro-impacted gravel piles and surrounded by closed cutoff wall. The stability of dam slope is checked with Bishop method and Swedish circle method; the stress and deformation of dam body and foundation are computed with 3D finite element incremental method.
Keywords:rockfill dam with asphalt-concrete core  foundation treatment  stability of dam  stress and deformatoin of dambody and foundation