首页 | 本学科首页   官方微博 | 高级检索  
     

PPP项目界面管理关键影响因素研究
引用本文:胡欣,王建廷,王宇飞,谷金雨. PPP项目界面管理关键影响因素研究[J]. 科技进步与对策, 2016, 33(16): 73-76. DOI: 10.6049/kjjbydc.2016GC0106
作者姓名:胡欣  王建廷  王宇飞  谷金雨
作者单位:天津城建大学 经济与管理学院,天津 300384
基金项目:教育部人文社会规划基金项目(11YJA630090);天津市哲学社会科学规划项目(TJGL15-022)
摘    要:PPP项目界面可从合同、组织、实体3个维度划分,对这3种界面予以清晰界定对于PPP项目的界面管理优化至关重要。对PPP项目界面系统各类界面进行剖析,应用BP-DEMATEL,即后馈神经网络(Back-Propagation Neuron network)与决策试行及评价实验室评价(DEMATEL)相融合的方法,识别并分析PPP项目界面管理关键影响因素。其中,BP网络的链接权重代替了直接影响矩阵(DIM)的元素,降低了传统DEMATEL方法中专家构造DIM的主观性,提高了关键影响因素识别的可操作性与客观性。

关 键 词:PPP项目管理  界面管理  BP-DEMATEL  
收稿时间:2016-06-29

Research on Key Influencing Factors of the Management of PPP Project Interface
Hu Xin,Wang Jianting,Wang Yufei,Gu Jinyu. Research on Key Influencing Factors of the Management of PPP Project Interface[J]. Science & Technology Progress and Policy, 2016, 33(16): 73-76. DOI: 10.6049/kjjbydc.2016GC0106
Authors:Hu Xin  Wang Jianting  Wang Yufei  Gu Jinyu
Affiliation:School of Economics and Management, Tianjin Chengjian University, Tianjin 300384, China
Abstract:It is vital for optimization on the interface management that PPP project is clearly defined three dimension inter‐face including contract interface ,organization interface and entity interface .T his article analyzes all kinds of interfaces in the PPP project interface system ,and recognizes key factors influencing PPP project interface by the application of BP‐DE‐MATEL ,i .e .combining Back -propagation Neuron network with making trial and evaluation laboratory evaluation .It replaces elements which directly influence matrix (DIM ) with the importance of BP network connection .It also reduces the subjectivity in the traditional DEM A T EL method during professor set up DIM ,w hich by the maneuverability and ob‐jectivity relied on the proposed method through examples .
Keywords:PPP Project Management  Interface Management  BP-DEMATEL
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《科技进步与对策》浏览原始摘要信息
点击此处可从《科技进步与对策》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号