荔浦县蒲芦水电站工程拱坝水工整体模型试验研究
引用本文:张创. 荔浦县蒲芦水电站工程拱坝水工整体模型试验研究[J]. 企业科技与发展, 2009, 0(9): 172-173
作者姓名:张创
作者单位:广西水利科学研究院,广西南宁530023
摘    要:文章论述了荔浦县蒲芦水电站拱坝的试验研究工作,通过水工模型试验,测定溢流堰泄流能力,观测堰面及下游河道水流流态,以及各种泄流工况时下游河道被冲刷的情况,由此对拱坝提出优化方案。

关 键 词:水电工程  模型  拱坝

A Study on Hydraulic Model Test of Pulu ttydropower Project in Lipu County
ZHANG Chuang. A Study on Hydraulic Model Test of Pulu ttydropower Project in Lipu County[J]. , 2009, 0(9): 172-173
Authors:ZHANG Chuang
Affiliation:ZHANG Chuang ( Guangxi Hydropuwer Research Institute, Nanning Guangxi 530023)
Abstract:The article elaborates on the study work on hydraulic model test of Pulu hydropower project in Lipu county and determines the discharge capacity of flooding weir, observes the flow condition of weir surface and the downstream via hydraulic model test and river degradation at downstream under different discharge conditions. Through this model test, the article proposes optimum scheme for arch darn.
Keywords:hydropower project  model  arch dam