750kV输电线路工程多种吨位吊车组合立塔施工
引用本文:李从刚,陆国智,张哲让.750kV输电线路工程多种吨位吊车组合立塔施工[J].价值工程,2013(14):132-133.
作者姓名:李从刚  陆国智  张哲让
作者单位:吉林省送变电工程公司,长春130031
摘    要:新疆与西北主网联网750千伏第二通道线路工程(第5标段)位于哈密地区戈壁滩,地形平坦,适合大规模采用吊车进行组立,根据塔高采取多种吨位的吊车组合进行铁塔组立,施工效率高,综合成本低,施工安全可靠,取得良好的效果。

关 键 词:输电线路  吊车组合  立塔  施工

A Variety of Tonnage Crane Combination Vertical Tower Construction of 750kV Transmission Line Project
Abstract:The second channel(Lot5) project of Xinjiang and the northwest main network interconnection 750 kV line is located in the Gobi Desert of Hami region,and its terrain is flat,so it is suitable for using the large-scale crane assembly.The way of taking a variety of crane combination according to the height of tower to do tower assembly has achieved good results due to its high efficiency,low cost,safe and reliable construction.
Keywords:transmission lines  crane combination  vertical tower  construction