首页 | 本学科首页   官方微博 | 高级检索  
     

浙江省标准农田质量提升工程管理信息系统设计与实现
引用本文:单英杰,任周桥,吕晓男,倪治华,程街亮. 浙江省标准农田质量提升工程管理信息系统设计与实现[J]. 国土资源科技管理, 2011, 28(6): 61-65. DOI: 10.3969/j.issn.1009-4210.2011.06.012
作者姓名:单英杰  任周桥  吕晓男  倪治华  程街亮
作者单位:1. 浙江省土肥站,杭州,310020
2. 浙江省农业科学院数字农业研究所,杭州,310021
摘    要:为保障粮食安全,严格实施千万亩标准农田质量提升工程,在整合全省标准农田上图入库成果和标准农田地力调查与分段定级成果数据的基础上,设计并实现了浙江省标准农田质量提升工程管理信息系统。基于确保数据安全和控制软件运行成本的考虑,整个系统分离为单机版的标准农田质量提升项目实施区块划定工具、B/S模式的标准农田质量提升项目实施区块审核管理子系统和C/S模式的标准农田质量提升项目申报管理子系统,3个系统相互结合形成一个有机的整体。通过系统的运行,能够较好地促进全省标准农田质量提升实施工作的有序管理,实现单个项目和整体工程的动态管理。

关 键 词:标准农田  质量提升  管理信息系统  GIS  浙江省

Design and Implementation of Management Information System for Standard Farmland Quality Improvement Project in Zhejiang Province
SHAN Ying-jie,REN Zhou-qiao,L Xiao-nan,Ni Zhi-hua,Chen Jie-liange. Design and Implementation of Management Information System for Standard Farmland Quality Improvement Project in Zhejiang Province[J]. Scientific and Technological Management of Land and Resources, 2011, 28(6): 61-65. DOI: 10.3969/j.issn.1009-4210.2011.06.012
Authors:SHAN Ying-jie  REN Zhou-qiao  L Xiao-nan  Ni Zhi-hua  Chen Jie-liange
Affiliation:SHAN Ying-jie,REN Zhou-qiao,L(U) Xiao-nan,Ni Zhi-hua,Chen Jie-liange
Abstract:To ensure food security,the management approach for arable land quality has been legislated in Zhejiang Province in 2011,in which the quality improvement project of standard farmland is an important task in the following years.For the purpose of strictly implementing the project,the management information system has been designed and realized,where the vector maps of standard farmland and the result of farmland fertility survey in the whole province have been integrated firstly as its base database.For the sake of data security and low cost of software,the whole system is separated into three sub-systems.One is stand-alone version oriented to users belong to counties,which is used for project’s implementation location selection and the vector map making.The second is B/S mode oriented to all users,which is used for planning,project applying,approval,implementation and acceptance.And the third is C/S mode oriented to administrators,which mainly is used for checking the vector map uploaded with project applied by counties’ user.The three sub-systems are operated interactively as a union system,demonstrating that the proposed system can assist to arrange and manage the improvement project orderly,which will help not only to eliminate such problems as duplication of applying and inaccurate applying,but also to enhance the dynamic management of the individual and the overall project.
Keywords:standard farmland  quality improvement  management information system  GIS  Zhejiang Province
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号