首页 | 本学科首页   官方微博 | 高级检索  
     

大断面软弱围岩隧道三台阶临时仰拱分区施工工法
引用本文:吕超 等. 大断面软弱围岩隧道三台阶临时仰拱分区施工工法[J]. 价值工程, 2014, 0(8): 148-150
作者姓名:吕超 等
作者单位:中铁十二局集团第一工程有限公司,西安710000
摘    要:随着经济的不断发展,交通基础设施有实现了迅猛发展,进而推动了软弱围岩隧道施工方法的发展。在施工过程中,通过采用三台阶法进行施工,能够有效地降低施工成本,提高工效,同时能够确保施工的安全性和稳定性,进而在一定程度上为大断面软弱围岩隧道施工提供参考依据。

关 键 词:大断面施工  三台阶  仰拱

Construction Method of Weak Surrounding Rock Tunnel in Large-section with Temporary of Three Steps Inverted Arch
LV Chao,HE Peng. Construction Method of Weak Surrounding Rock Tunnel in Large-section with Temporary of Three Steps Inverted Arch[J]. Value Engineering, 2014, 0(8): 148-150
Authors:LV Chao  HE Peng
Affiliation:(The 1st Engineering Co. ,Ltd. of China Railway 12th Bureau Group,Xi'an 710000,China )
Abstract:With the development of economy, the transportation infrastructure has also achieved rapid development, thus the of method soft surrounding rock tunnel construction is widely used. In the process of construction, using the three step method, can effectively reduce the construction cost, improve work efficiency, and can ensure the safety and stability of construction. To a certain extent, it provides a reference for large section soft rock tunnel construction.
Keywords:large-section construction  method of three steps  inverted arch
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号